It has been over 1 year since an excavation for a new Wal-Mart store in Kilbuck Township, PA caused a massive landslide that closed Route 65 for two weeks, and temporarily closed a rail line as well. Strong storms last month apparently caused an increase in the rate of movement of the now instrumented slide. The state DEQ feels the movement is deep-seated, but Wal-Mart disagrees. See our previous coverage or go to the video from the local CBS affiliate or news and photos from the local ABC affiliate.
Related Articles
Tragic mudslide in Washington kills at least 8
Devil’s Slide Tunnel, Project Updates and Geotechnical Info
Devil’s Slide is an infamous landslide along California’s Highway 1 or Pacific Coast Highway near Pacifica, just south of the San Francisco Bay area. Caltrans’ Devil’s Slide Tunnel project is an effort to bypass that slide and make the heavily traveled roadway safe for drivers and to eliminate the maintenance and traffic hassles caused by slope failures blocking the road. We first covered the project back in September of 2007 when the tunnel portion of the project commenced. In that post, you can find a Google Earth KML File showing the location of the tunnels and the new bridges associated with the project. In this post, I’ll provide you with some updated progress information as well as some background on the geotechnical and other aspects of the project. More links and videos are at the end of the post. (Photo by Kim Komenich, San Francisco Chronicle). […]
Washington DNR Releases Preliminary Report on Whidbey Island Landslide
Onsite Visit Leads To Ledgewood-Bonair Landslide Quick Report OLYMPIA – The Washington State Department of Natural Resources Division of Geology & Earth Resources has released their quick report on the Whidbey Island “Ledgewood-Bonair” landslide that […]