Member Login

Login
No account yet? Register
 

Search GeoPrac

Site Sponsors

Even More News and Blog Posts!

New on GeoPrac.net, the Other News and Blogs page has had a major facelift. To supplement our regular GeoNews and Articles, we aggregate news feeds and blog entries from all over the web into one easy to browse source. Check it out!  

Become an Author

GeoPrac.net is a community site, we are only as good as the content our members contribute!

Whether it's a one time contribution, or a monthly or quarterly article, please consider becoming an author

Subscribe by Email

Subscribe to GeoPrac.net Headlines by Email. Powered by FeedBurner.com, Don't forget to follow instructions to verify your subscription!

Enter your email address:

RSS Feeds

To subscribe to GeoPrac.net headlines, use one of the buttons below. Or view other available feeds or read more about RSS.

Home arrow GeoNews arrow Browse by Category arrow Project Related arrow Hanging Lake Tunnel (Colorado) repair nearly complete
Hanging Lake Tunnel (Colorado) repair nearly complete Print E-mail
Written by Randy Post   
Wednesday, 17 October 2007
Digg!Reddit!
Del.icio.us!Google!
Facebook!Slashdot!
Technorati!StumbleUpon!
Newsvine!Furl!
Yahoo!Ma.gnolia!

A stretch of tunnel on Eastbound I-70 in scenic Glenwood Canyon Colorado was closed last March because of a 70-foot long crack in the ceiling. Since then the two-lane westbound bore has been handling both eastbound and westbound traffic while repairs to the damaged segment were undertaken. This project has a little of everything: heavy excavation, rockfall, slab reinforcing, geofoam, and even geogrid! Read on for more details, a map and photos. (Photo by Concrete Works Of Colorado)

The tunnel goes between two mountains with the tunnel control center being located in between. That portion of the tunnel appears to have been constructed using cut and cover methods. The tunnel and the control center were partially backfilled to help them blend in to the scenery.

 

(Photo by CDOT and Colorado Public Works Journal)

The problems appear to have been related to rockfall that landed on this portion of the tunnel, increasing the loads. At one point there was believed to be up to 500 cubic yards of additional material on top of the structure, increasing the total load on the ceiling to 25,000 kips!

The fix involved stripping the inside of the tunnel and bracing it with structural steel, excavating down to the structure from the top, coring holes in the tunnel ceiling, grouting #7 rebar into the holes (extending both top and bottom), grouting up the crack, and installing a new reinforced slab both above and below the existing ceiling slab for a total thickness of 6-ft.

Once the structural repair was complete, they installed 3-ft of structural backfill, a 10-ft thick layer of geofoam to decrease loading from the overburden, and a 5-ft thick layer of geogrid-reinforced structural backfill. As I understand it, this was to help distribute the impact and loading in the event of any future rockfall events.

Related Items:

Trackback(0)
Comments (0)add comment

Write comment
quote
bold
italicize
underline
strike
url
image
quote
quote
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley

security image
Write the displayed characters


busy
Last Updated ( Friday, 26 October 2007 )
 
< Prev   Next >

Site Sponsors

Users Online

No Users Online

Statistics

Members: 48
News: 308
Web Links: 36

GeoPrac.net © 2007 Randy Post unless noted.
Terms of Use | Copyright Info | Privacy Policy | Disclaimer | Sitemap

Other Randy Post Sites: RnRPost.com | NameDrawing.net