Important Info

Featured Sponsor

Become an Author

GeoPrac.net is a community site, we are only as good as the content our members contribute! Whether it's a one time contribution, or a monthly or quarterly article, please consider becoming an author!

Latest Comments in...

Foundations and Geotechnical Engineering for the Burj Dubai
it's a good job for the engineers....... But i wanna know that how does the
An inside look at fracking a well
Good post, Randy. Unfortunately, the "anti-_____" crowd seems to get the u
Foundations and Geotechnical Engineering for the Burj Dubai
This Y shape along with the upward spiraling pattern of setbacks in the win
Video: Terracon's Hurricane Deck Bridge Project, Missouri
What is the dead load of the existing hurricane deck bridge?
Content

Our Sponsors

Banner
Banner
Banner

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Banner
Banner
Banner
APE's 400 Vibratory Driver Extractor, 'King Kong' Extracts 140-ft Piles PDF Print E-mail
Written by Randy Post   
Monday, 04 April 2011 05:51
APE 400 vibratory driver/extractor in New Orleans

In Bell Chase, Louisiana, a huge vibratory driver/extractor manufactured by American Piledriving Equipment Inc. was used to extract 54-in diameter pipe piles 140-ft deep. The piles were part of a cofferdam for the largest pumping station in New Orleans. The contractor was a joint venture between Kiewit Corp. and Traylor Brothers Construction Inc. [Source: National Driller Foundation Report Newsletter. Image: National Driller Foundations Report]

Hits: 1401
Trackback(0)
Comments (0)add comment

Write comment

security image
Write the displayed characters


busy