Important Info

Featured Sponsor

Become an Author

GeoPrac.net is a community site, we are only as good as the content our members contribute! Whether it's a one time contribution, or a monthly or quarterly article, please consider becoming an author!

Latest Comments in...

Foundations and Geotechnical Engineering for the Burj Dubai
it's a good job for the engineers....... But i wanna know that how does the
An inside look at fracking a well
Good post, Randy. Unfortunately, the "anti-_____" crowd seems to get the u
Foundations and Geotechnical Engineering for the Burj Dubai
This Y shape along with the upward spiraling pattern of setbacks in the win
Video: Terracon's Hurricane Deck Bridge Project, Missouri
What is the dead load of the existing hurricane deck bridge?
Content

Our Sponsors

Banner
Banner
Banner
Banner
Banner

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Banner
Swedish Nuclear Waste Repository Could Begin Construction in 2016 PDF Print E-mail
Written by Randy Post   
Tuesday, 23 June 2009 22:31

ENR reports that a nuclear waste repository for spent nuclear fuel in Sweden could begin construction as early as 2016. The facility would consist of 50km of tunnels in granite bedrock up to 500-m deep. The proposed site is approximately 75-km north of Stockholm. The projected cost of the facility is $2.5 billion to $3.2 billion (US$ I presume). The Swedes would be chasing the Finns who might be the first country to have a permanent underground nuclear waste repository for spent nuclear fuel. (Illustration by BBC of Finland's proposed repository)

Hits: 2010
Trackback(0)
Comments (0)add comment

Write comment

security image
Write the displayed characters


busy
Possibly Related News Items (Automagically Generated)
Last Updated on Tuesday, 23 June 2009 17:30