Important Info

Search GeoPrac.net

RSS Feeds

To subscribe to GeoPrac.net Headlines, use one of the buttons below, or subscribe to GeoPrac.net Headlines by Email. Also, view other available feeds or read more about RSS.

Subscribe in a reader

Our Sponsors

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Featured Sponsor

Become an Author

GeoPrac.net is a community site, we are only as good as the content our members contribute! Whether it's a one time contribution, or a monthly or quarterly article, please consider becoming an author!

Latest Comments in...

Foundations and Geotechnical Engineering for the Burj Dubai
it's a good job for the engineers....... But i wanna know that how does the
An inside look at fracking a well
Good post, Randy. Unfortunately, the "anti-_____" crowd seems to get the u
Foundations and Geotechnical Engineering for the Burj Dubai
This Y shape along with the upward spiraling pattern of setbacks in the win
Video: Terracon's Hurricane Deck Bridge Project, Missouri
What is the dead load of the existing hurricane deck bridge?
Content

Our Sponsors

Banner
Banner
Banner
Banner
Banner

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Banner
Kingdom Tower: World's Newest Tallest Building for 2016 PDF Print E-mail
Written by Randy Post   
Monday, 29 August 2011 06:04

Aerial view of proposed Kingdom Tower

The newly announced Kingdom Tower is slated to be the World's tallest when it is completed in 2016 in Jeddah, Saudia Arabia. Part of the $20B Kingdom City development, the tower will stand 3,280 feet tall and cost $1.2B itself. The architect is Adrian Smith who was also the lead architect on the current tallest building in the world, the Burj Khalifa in Dubai, UAE. You can see from the rendering (and others in the article) that the Kingdom Tower structure has a similar triangular footprint compared to the Burj Khalifa.

There is an excellent discussion of the geotechnical challenges, and really a synopsis of the entire foundation design process for the Kingdom Tower in the article from George Leventis, President of Langan International which is providing the geotechnical design.

The challenge with the Kingdom Tower foundation is to manage the settlement, resulting from the 900,000 ton building load, the one hundred yard foundation raft, and the very weak porous rock. Of course the building will settle. The goal is to make the settlement as uniform as possible. Differential settlement from one side to the other would result in a tilt of the structure. Excessive settlement from the center to the edge will induce huge structural demands on the foundation raft. The first step of the geotechnical engineer is to execute a thorough site investigation. For the Kingdom Tower, borings were extended as deep as 200 meters into the ground. Rigorous field and laboratory testing was performed to determine the strength and compressibility profile of the soil and rock materials. Two different finite element modeling programs were used to model the ground conditions, the applied building loads, and the support piles and predict the performance of the foundation raft. A full-scale instrumented pile load test program was performed in the field to confirm the design assumptions and refine the foundation model.

[Source: Huffington Post. Image: Adrian Smith + Gordon Gill Architecture via Huffington Post]

 

Hits: 1645
Trackback(0)
Comments (0)add comment

Write comment

security image
Write the displayed characters


busy
Possibly Related News Items (Automagically Generated)
Last Updated on Monday, 29 August 2011 13:08