Member Login

Login
No account yet? Register
 

Search GeoPrac

Site Sponsors

Even More News and Blog Posts!

New on GeoPrac.net, the Other News and Blogs page has had a major facelift. To supplement our regular GeoNews and Articles, we aggregate news feeds and blog entries from all over the web into one easy to browse source. Check it out!  

Become a Member!

  • Post links
  • Become an author
  • Network with other members
  • Post comments without the security image

Register Now! or Learn More.

Subscribe by Email

Subscribe to GeoPrac.net Headlines by Email. Powered by FeedBurner.com, Don't forget to follow instructions to verify your subscription!

Enter your email address:

RSS Feeds

To subscribe to GeoPrac.net headlines, use one of the buttons below. Or view other available feeds or read more about RSS.

Home
Highway Cut Slopes in Rock: Specialized Excavation and Enhancement Techniques - Introduction Print E-mail
Written by Robert Cummings   
Tuesday, 28 August 2007
Article Index
Introduction
Aesthetic Cut Slopes
 Characteristics of Enhancements
 Short Range Perspective
 Long Range Perspective
Rock Excavation Techniques
Conclusions
Digg!Reddit!
Del.icio.us!Google!
Facebook!Slashdot!
Technorati!StumbleUpon!
Newsvine!Furl!
Yahoo!Ma.gnolia!

Characteristics of Aesthetic Enhancements

It is immediately realized by anyone examining the topographic setting of most highway projects that it is impossible to exactly replicate natural land forms in engineered rock cuts. In nature, stable, natural land forms almost always comprise flatter slopes than highway departments wish for their rock cuts. Where the natural landscape is sufficiently rugged that it incorporates cliff faces and natural rock slopes approximating the desired cut slope angles, the condition of the natural rock slopes is generally much more degraded than is desired in the highway cuts. For these reasons, cut slopes cannot be made to exactly look “natural”, even if that is what is required in construction bid documents.

To the construction contractor bidding on a rock excavation project, this means that, at the very least, he will not have to make the cut slopes indistinguishable from the backdrop. More problematically, a bidder may also believe that since the required appearance is not strictly attainable, under the pressures of actual construction the door will be open to negotiate a far lesser degree of compliance. Often, to the dismay of many (including the other, unsuccessful bidders whose estimates reflect a nobler intent), he is correct. To avoid this undesirable situation, several things must happen:

  1. The bid documents must require a standard of performance that is defined as much as possible in terms of measurable physical characteristics;
  2. The land use agency and the highway engineering team must work together to determine what those physical characteristics will be;
  3. The land use agency must commit to accepting the standard of aesthetic attainment implied by the criteria in the bid documents;
  4. The highway department must commit to inspection, measurement, and enforcement of aesthetic criteria as stridently as for more traditional elements of inspection;
  5. A process needs to be developed to review, and if necessary, attain consensus on modifications if and only if geologic conditions differ materially from those assumed during design.

The processes of achieving consensus, developing working relationships, and performing joint reviews during construction have been successfully accomplished through partnering. Partnering is now well known and accepted in the highway engineering community and will not be discussed further here. The remainder of this subsection will deal with what criteria have been found suitable and attainable on prior projects.

It is important to conduct visual prioritization to distinguish aesthetic enhancements that will actually be of benefit from those that are only a needless expense. The visual prioritization process is normally carried out by a landscape specialist working as part of a multidisciplinary highway design team, and in close coordination with the land management agency. Through the visual prioritization process, the team not only recognizes the various levels of visual impact that will occur due to highway construction, but agrees to eliminate from consideration those visual impacts that are not significant. The visual impacts must be considered in terms of the location, duration, and range of view. In general, the most significant visual impacts to the highway user are those that will be apparent for longer than 10 seconds or so. The pedestrian will generally have a narrower scope of view but hold it for a longer period. Two categories of visual impact emerge from the visual prioritization, the short range view, and the long range view.



Trackback(0)
Comments (1)add comment

Excavation said:

 
ExcavationDo think that that it will give more and more benefit to us of the geotechnical exploration in rock and soil, pavement design, retaining walls, drilled shafts, and heavy earthwork in rock and soil.
Friday January 11, 2008 01:48AM

Write comment
quote
bold
italicize
underline
strike
url
image
quote
quote
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley
Smiley

security image
Write the displayed characters


busy
Last Updated ( Thursday, 27 September 2007 )
 

Site Sponsors

Users Online

No Users Online

Statistics

Members: 48
News: 308
Web Links: 36

GeoPrac.net © 2007 Randy Post unless noted.
Terms of Use | Copyright Info | Privacy Policy | Disclaimer | Sitemap

Other Randy Post Sites: RnRPost.com | NameDrawing.net